top of page

How soon can we open the lot after re-striping?

  • Aug 18, 2016
  • 1 min read

How soon can we open the lot after re-striping?

Generally the parking lot can be reopened for regular traffic after striping within 1 hour of completion or sooner based on weather conditions. We take every precaution and make every effort to NEVER apply any coatings during or immediately prior to poor weather conditions.

 
 
 

Comments


Featured Posts
Recent Posts
Archive
Search By Tags
Follow Us
  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square
bottom of page